Skip to: main navigation | main content | sitemap | accessibility page

 Student Social Space

The Brief

  • To construct a new contemporary building to form a new social space for students within an existing courtyard.

Work Included

  • Demolition of existing building in an enclosed difficult to access area.
  • Traditional foundations and concrete raft slab.
  • Timber frame insulated structure clad with rough cut detailed softwood.
  • Internal walls clad with birch faced plywood.
  • Contractor designed mechanical and electrical installation.